一、滲水磚鋪設施工工藝流程
滲(shen)水(shui)磚的(de)鋪(pu)設施(shi)(shi)工(gong)需要(yao)按照正確的(de)施(shi)(shi)工(gong)工(gong)藝流(liu)程(cheng)進行,一(yi)般先要(yao)確定鋪(pu)砌結構,分為透(tou)水(shui)磚、找平層(ceng)、承載層(ceng)三層(ceng),然后做好施(shi)(shi)工(gong)準備再(zai)開始施(shi)(shi)工(gong),具體(ti)的(de)施(shi)(shi)工(gong)工(gong)藝流(liu)程(cheng)如下(xia):
1、施工準備
施(shi)(shi)工(gong)(gong)(gong)(gong)前,參施(shi)(shi)人員應認真(zhen)學(xue)習(xi)設(she)計文件,并熟(shu)悉施(shi)(shi)工(gong)(gong)(gong)(gong)現(xian)場(chang)情況,包括:現(xian)場(chang)地形地貌、工(gong)(gong)(gong)(gong)程地質條(tiao)件、施(shi)(shi)工(gong)(gong)(gong)(gong)供水、供電、排水、交(jiao)通運輸等;然后(hou)制定施(shi)(shi)工(gong)(gong)(gong)(gong)組織設(she)計,并向(xiang)監理工(gong)(gong)(gong)(gong)程師報批(pi),通過批(pi)準(zhun)后(hou),組織施(shi)(shi)工(gong)(gong)(gong)(gong)作業人員、材料進場(chang)。
2、測量放線
對給定的控制(zhi)點進行復測(ce)驗線(xian),并按設計圖紙(zhi)進行實地放線(xian),標定高程,一(yi)般(ban)為10米一(yi)樁,曲線(xian)段(duan)適當加密(mi)。
3、基層施工
采用人工或機械按標高填挖土(tu)方,挖土(tu)方不宜鑿洞取土(tu),如填土(tu)方>20厘(li)米(mi)應(ying)符合路(lu)基土(tu)填土(tu)基本(ben)要求。場地經找平(ping)(根據土(tu)質預留虛(xu)高)后用平(ping)碾或夯具夯實直(zhi)至達(da)到密(mi)實度(du)要求。碾壓應(ying)自(zi)地基邊緣向(xiang)中央(yang)進行,壓路(lu)機每(mei)次重疊150~200毫米(mi),約碾壓5~8遍,至表面(mian)無顯著輪跡(ji),輪跡(ji)深(shen)度(du)不大于5毫米(mi),且達(da)密(mi)實度(du)為止(zhi)。
場(chang)地(di)彈軟地(di)段(duan)可采用(yong)換(huan)填、強(qiang)夯、預(yu)浸、擠密等(deng)方法進行處(chu)理(li),如采用(yong)人工(gong)或機械挖除(chu)軟土,換(huan)填強(qiang)度較(jiao)高的(de)黏性(xing)土或砂(sha)、礫、卵石、片石等(deng)滲水性(xing)材料。如有地(di)下管(guan)線(xian)等(deng)設施同時施工(gong),應做好溝(gou)槽還填處(chu)理(li)。當管(guan)線(xian)埋設覆土深度<50厘(li)米厚時,為保障地(di)下設施不(bu)受毀壞可采用(yong)反開槽施工(gong),先修筑基層(ceng)后開槽。
基(ji)層完工(gong)后,外(wai)觀不得彈軟(ruan)、積(ji)水(shui),無(wu)明顯輪跡。
4、承載層施工
承載(zai)層施工主要采(cai)用兩種(zhong)材料(liao):透水(shui)混凝土或級(ji)配碎石:
(1)透水(shui)(shui)(shui)(shui)混(hun)凝(ning)(ning)土(tu)(tu):配(pei)制透水(shui)(shui)(shui)(shui)混(hun)凝(ning)(ning)土(tu)(tu)應采用42.5及(ji)以上強度等級的(de)水(shui)(shui)(shui)(shui)泥(ni)及(ji)較大(da)幅度級配(pei)的(de)卵石骨(gu)(gu)料,水(shui)(shui)(shui)(shui)泥(ni)用量宜在(zai)250~350千(qian)克/立方米,骨(gu)(gu)料用量宜為(wei)1200~1400千(qian)克,水(shui)(shui)(shui)(shui)灰比宜為(wei)0.25~0.40。澆筑(zhu)前,先用水(shui)(shui)(shui)(shui)濕潤路(lu)面,防止混(hun)凝(ning)(ning)土(tu)(tu)水(shui)(shui)(shui)(shui)分流(liu)失(shi)加速水(shui)(shui)(shui)(shui)泥(ni)凝(ning)(ning)結。由于無砂混(hun)凝(ning)(ning)土(tu)(tu)中水(shui)(shui)(shui)(shui)泥(ni)量有限,只能包裹(guo)骨(gu)(gu)料顆粒,因此,在(zai)澆筑(zhu)過程中不得強烈振搗或夯實,否(fou)則將會使水(shui)(shui)(shui)(shui)泥(ni)漿沉積,破壞混(hun)凝(ning)(ning)土(tu)(tu)結構均(jun)勻性(xing),并(bing)在(zai)底(di)部(bu)形成(cheng)不透水(shui)(shui)(shui)(shui)層。澆筑(zhu)成(cheng)型后(hou),可用塑料薄膜覆(fu)蓋(gai)表面,并(bing)開(kai)始灑(sa)水(shui)(shui)(shui)(shui)養護,養護時(shi)間不少于14天。
(2)級配礫石:碎石粒(li)徑(jing)宜取5毫米(mi)、10毫米(mi)、20毫米(mi)三種,按1:1:1的比(bi)例配比(bi)混合,用(yong)平板(ban)振動器分層(ceng)壓(ya)實或(huo)者(zhe)用(yong)12噸以上(shang)壓(ya)路機碾壓(ya),輪壓(ya)深度不得大于5毫米(mi),壓(ya)實密度不小于2噸/立方米(mi)。
5、找平層施工
透水磚的找平(ping)層采用(yong)風積沙,利(li)用(yong)粘結材料常溫固(gu)結而(er)成(cheng)。原材攪拌時(shi)應(ying)嚴格按配(pei)方下(xia)料,每(mei)罐料應(ying)在(zai)5分鐘內攪拌均勻(yun),且(qie)攪拌站不得(de)遠(yuan)離施工現(xian)場。
采用刮板法(fa)攤鋪(pu)找平(ping)層(ceng),根據施工場(chang)(chang)地(di)用途的不同,確定相應的攤鋪(pu)厚度,一般(ban)人行道的找平(ping)層(ceng)厚度為(wei)20~25毫(hao)米(mi)(mi),停車(che)場(chang)(chang)的找平(ping)層(ceng)厚度為(wei)30~35毫(hao)米(mi)(mi),車(che)行道的找平(ping)層(ceng)厚度為(wei)35~40毫(hao)米(mi)(mi)。
6、透水磚鋪砌
按放線(xian)高程,在(zai)(zai)方(fang)格內按線(xian)按標準(zhun)縫(feng)寬砌(qi)第一(yi)行(xing)樣板(ban)磚(zhuan),然后(hou)以(yi)此掛縱橫(heng)線(xian),縱線(xian)不動,橫(heng)線(xian)平(ping)移,依次(ci)按線(xian)及樣板(ban)磚(zhuan)砌(qi)筑(zhu)(zhu)。直線(xian)段(duan)縱線(xian)應(ying)向遠處延伸(shen),以(yi)保(bao)持(chi)縱縫(feng)直順。曲線(xian)段(duan)可(ke)砌(qi)筑(zhu)(zhu)成扇形狀,空(kong)(kong)隙部分(fen)用切(qie)割(ge)磚(zhuan)填(tian)筑(zhu)(zhu),也可(ke)按直線(xian)順延鋪(pu)筑(zhu)(zhu),然后(hou)填(tian)補(bu)邊(bian)(bian)緣(yuan)處空(kong)(kong)隙。砌(qi)筑(zhu)(zhu)時應(ying)避免與(yu)路緣(yuan)石出現(xian)空(kong)(kong)隙,如有(you)空(kong)(kong)隙應(ying)甩在(zai)(zai)建筑(zhu)(zhu)物一(yi)側(ce),當建筑(zhu)(zhu)物一(yi)側(ce)及井邊(bian)(bian)出現(xian)空(kong)(kong)隙可(ke)用切(qie)割(ge)磚(zhuan)填(tian)平(ping)。如遇到切(qie)磚(zhuan)現(xian)象,必須(xu)將磚(zhuan)進行(xing)彈線(xian)切(qie)割(ge);如遇到連續(xu)切(qie)割(ge)磚(zhuan)的(de)現(xian)象,必須(xu)保(bao)證切(qie)邊(bian)(bian)在(zai)(zai)一(yi)條直線(xian),偏差不得大于2毫米。
砌筑時,磚(zhuan)要輕放(fang),落磚(zhuan)必須貼近已鋪(pu)好的(de)磚(zhuan)垂直落下,不能(neng)推磚(zhuan),造成積(ji)砂(sha)現(xian)象(xiang)。用木錘或(huo)膠(jiao)錘輕擊磚(zhuan)的(de)中間1/3面積(ji)處,使(shi)磚(zhuan)平鋪(pu)在滿(man)實的(de)找平層(ceng)上(shang)穩定。如(ru)果找平層(ceng)過厚,應(ying)重(zhong)新調整(zheng)(zheng)找平層(ceng),如(ru)果找平層(ceng)過薄,不得向磚(zhuan)底塞(sai)砂(sha)或(huo)支墊硬(ying)料(liao)。為保證平整(zheng)(zheng)度,鋪(pu)砌時應(ying)隨時用水平尺檢驗平整(zheng)(zheng)度,出現(xian)問題及時修整(zheng)(zheng)。
7、灌縫
透水磚鋪砌完成并養護(hu)24小時后,用(yong)灌縫(feng)砂灌縫(feng),分多次進行,直至(zhi)縫(feng)隙飽滿,同時將遺留在磚表(biao)面的(de)余砂清理干凈。
8、養護
透水磚鋪(pu)砌后,養護時間不得(de)少于(yu)7天。
9、現場清理
完工(gong)(gong)后應將分(fen)散在各處物(wu)料集中,保持工(gong)(gong)地整潔。對(dui)完工(gong)(gong)后的(de)面層根據質量要求進行檢測和維修。
二、透水磚施工過程中要注意哪些
1、鋪設(she)之前,一(yi)定要做一(yi)下找平的(de)處理。
2、不要直(zhi)接站在找平層上面工作(zuo),也(ye)不能夠在鋪設(she)好的透水磚上面攪(jiao)拌水泥砂漿。
3、透水磚內(nei)(nei)部(bu)為多孔結構(gou),在鋪裝(zhuang)前必(bi)須(xu)保持濕潤(run),避免鋪裝(zhuang)過程中(zhong)水泥漿(jiang)中(zhong)的(de)水分進入透水磚內(nei)(nei);但要注意避免透水磚表面滯留大量的(de)水分。
4、不論是開挖路(lu)基還是墊層(ceng)(ceng)、基層(ceng)(ceng)的鋪設(she),都需要(yao)(yao)注(zhu)意地下的排水組織(zhi),路(lu)基開挖需要(yao)(yao)避開地下所埋設(she)的各種管線,而(er)墊層(ceng)(ceng)與基層(ceng)(ceng)的鋪裝則要(yao)(yao)注(zhu)意有無排水組織(zhi)。
5、為了增強透水磚路面的整體(ti)性(xing)以(yi)及穩(wen)固性(xing),一般鋪設后(hou)的三(san)四天內必須(xu)(xu)保(bao)持干燥,不(bu)可接受(shou)雨(yu)水(shui)的沖刷(shua),所以(yi)在透水(shui)磚(zhuan)施工(gong)過程中,必須(xu)(xu)避開雨(yu)水(shui)天氣(qi)。與此同時(shi),施工(gong)時(shi)還要(yao)避免(mian)周圍溫(wen)度過低,否(fou)則會(hui)影響水(shui)泥(ni)漿的固化。
6、對透水磚進(jin)行切割的時候,需要選(xuan)擇專業的切割機,按照一定(ding)的比例來切割。
7、鋪(pu)設(she)好(hao)的透(tou)水(shui)磚,要檢查(cha)它(ta)的平整度,還有它(ta)的牢固性怎么樣,如果有問題要立即進行修整。
8、透(tou)水(shui)磚鋪(pu)設好之后,表面不能夠(gou)有殘余(yu)的(de)水(shui)泥砂(sha)漿,在養護期間(jian),強度一定要(yao)達到相關(guan)的(de)要(yao)求。